"Accessory Dwelling Unit - Describe Plan - Addition, basement finish, new structure."

That line comes from the City of Fountain Utilities Department's Final Water Availability Application, revised March 12, 2026. ADUs have their own checkbox on the form, and a basement finish is one of the listed options. The form is required as part of a complete land-use submittal for any property that wants City water.

State and local ADU updates

Colorado's HB24-1152 took effect May 13, 2024, and gave certain cities until June 30, 2025, to allow accessory dwelling units. The Colorado Division of Local Government lists Fountain as one of those "subject jurisdictions."

Fountain has since updated its own code. On September 8, 2026, City Council approved Ordinance 1824 on second reading by a 6-1 vote. It amends Title 17, including the ADU requirements in Sections 17.13.070 F and G. Planning Director Wade Broadhead reported no changes from first reading. Council Member Verhoeff said his no vote was against the state mandate behind the ordinance, not against the work city staff had done. Anyone pricing a specific lot should get the current text of 17.13.070 from Fountain Planning.

Water meters and the utility form

Go back to the utility form. For a duplex, the residential section says each unit "Requires separate Tap/Meter per unit." The ADU line right below it asks you to describe the plan and says nothing about meters. The form asks for "specific end-uses and water tap/meter sizes and quantities."

The answer matters because of how Fountain's 2026 Water System Connection Fees are written. The schedule lists a one-time fee for a new connection or upsizing an existing meter. The residential rate covers "water service to each individually metered residential unit."

Fountain Electric sends anyone adding load to its residential load-data form. The Residential Load Data Form asks for the "Number of Units" and the "Number of Meters." Wastewater is a separate agency. Fountain Sanitation District, not City Utilities, provides sewer service. The district's rates and fees page defines a residential dwelling unit as a unit "with a separately metered water service to each living unit" when it classifies user fees.

The published fee lines

Here are the fees Fountain's utilities have posted for 2026. Whether each one applies to a particular ADU depends on how the utility treats that project:

Fee Published amount Source date
Water acquisition fee, 3/4" residential $9,193 Adopted Feb. 24, 2026, Resolution 26-008
Water infrastructure fee, 3/4" residential $10,173 Adopted Feb. 24, 2026
Total 3/4" residential water connection $19,366 Adopted Feb. 24, 2026
Sanitation plant investment fee, first 18 fixture units $5,647 minimum base District schedule effective with March 2026 billing
Each fixture unit above 18 $186 Line dated 1/1/2010
Electric line extension fee $1,191 Approved April 28, 2026
Electric system development fee $2,266 Approved April 28, 2026

For properties outside the Sanitation District, the district lists a minimum base plant investment fee of $11,294, double the in-district figure. Meter hardware is the one small break. The city supplies 3/4" and 1" meters at no extra cost at installation, and meters 1-1/2" and larger are special-ordered and billed to the builder or owner.

Here's how that plays out in a deal. Two Fountain houses can look the same on paper, each with a finished basement that has its own entrance. If one can add an ADU on the existing service and the other needs a new connection, they carry very different costs for an investor. Listing data doesn't show that difference.

Where to start, in order

Fountain's water availability process has two steps. The Preliminary Water Availability Application comes at the concept stage. The final application goes in with the land-use submittal.

  1. Call Fountain Planning at (719) 322-2000 and ask for the current Section 17.13.070 language as amended by Ordinance 1824.
  2. Ask Fountain Utilities how it would meter your specific plan. Ask about the existing meter, a separate meter, and whether the combined load triggers upsizing.
  3. Confirm sewer service with Fountain Sanitation District. Ask whether the parcel is inside the district and how it counts fixture units for the new kitchen and bath.
  4. Submit Fountain Electric's load-data form before you assume the existing panel and service will carry a second unit.
  5. Line up building review with the Pikes Peak Regional Building Department, which does plan review, permitting and inspections in Fountain. PPRBD's online list includes a "Residential Detached Accessory Structure (Conditioned)" plan type for Fountain. That's a building classification, not zoning approval for a dwelling.
  6. Read the HOA's accessory-building and remodel standards.

On the city side, Fountain's posted development fee schedule lists a $110 plot-plan fee for single-family and two-family projects. Those entries are marked 2020, so confirm the current amount with Planning.

Quick questions

Does the utility form list basement ADUs? The utility form lists "basement finish" as one of the ADU plan types you describe.

What does Fountain's fee schedule list for short-term rentals? Fountain lists a $100 short-term rental permit on its fee schedule. Get the current local rules from Planning before you count on that income.

This post is general information, not legal, tax or financial advice. Confirm how these rules and fees apply to your property with Fountain's departments and the right professionals.

If a Fountain property's price depends on its ADU potential, we'll help you get the utility answers. DogHouse Real Estate Group works through the meter, sewer and permitting questions on investor and house-hack purchases. Schedule a free consultation and bring the address.